I inserted the sharing links via the short code and wanted to change the order of the codes. How is this possible?
I also altered the size of the sharing.links element images to font-size 30px. But now they are now looking bad because the padding and ohter settings arent right anymore. Is there a easy way to fix or do i have to restyle each element in the css?
Hi,
You can change the order of icons like as example: [social size="standard" type="twitter,vimeo,facebook"]
to [social size="standard" type="facebook,vimeo,twitter"]
Sorry to reopen this theme but, in the footer of my site i changed the size to 40px per css and this breaks the whole look of the trnasition and the layout of the item.
Is there a way to get this fixed or can you give me a hint with this issue? We need bigger social icons as the normal large-size on this site:
Ok, but i cant change the order in social-share shortcode, not the social shortcode. It takes no parameters, is this right, so there is no possibility to change the order?